Plans

Why plans make bigger jobs go better, how the plan wizard settles conflicting ideas, and how to tell when a plan is nearly done.

A plan is a short list of goals for a bigger piece of work, each with a line that says how you'll know it's done. The assistant works through the goals in order and ticks each one off. To make one step by step, follow the Plans tutorial.

Why plan

When you ask for something big in a single message, the assistant fills every gap with a guess. Most guesses are reasonable. A few are not, and you only find out once the work is done.

A plan moves those decisions to the start, when they are cheap to change:

  • You agree what "done" means for each goal, before the work starts.
  • Conflicts are settled by you, not by the assistant's guess.
  • Things to leave out are written down, so the assistant doesn't wander into them.
  • You can see progress, goal by goal, instead of waiting for one big answer.

A plan lasts until the work is done

Plans are not documents to maintain. Once every goal is ticked, the plan is complete and moves to the Completed list on its own. Nothing un-completes it, and there is nothing to tidy up.

How the wizard keeps ideas from conflicting

The plan wizard has four steps: The basics, Main goals, Fill the gaps and How ready is it?.

In Fill the gaps, the wizard reads your goals and looks for places where they pull in different directions, or where the project would have to pick one way on its own. Those questions are listed under Needs your answer. For each one you either:

  • Answer it, so the assistant knows which way to go, or
  • Exclude it, which writes it into the plan as out of scope.

Either way, the conflict is settled before the assistant sees the plan. Optional questions follow, under Questions that would help.

When you edit a saved plan, the questions from the project's last check are added here too.

Knowing when you're close

Inferise Code gives you three different measures. They answer different questions.

MeasureWhereWhat it tells you
How complete is it?The wizard, steps 2 and 3How much of the plan you have filled in. A quick count on your Mac, not a judgment.
How ready is it?The wizard, step 4, and the coloured bar on a saved planThe project's own opinion, after reading the plan alongside its files. Questions it still has are listed with it.
1 of 4 doneA saved planHow many goals the assistant has finished.

You're close when the goals are nearly all ticked and the ones left have a clear How you'll know line. If the readiness check still lists questions under Needs your answer, answer them first: they are the most likely reason a goal comes back wrong.

Plans for a whole workspace

When a piece of work touches several projects, choose Whole workspace under For in the first step. The plan is listed under Workspace in the Plans pane and is checked in the project where it will start.

Plans from other tools

If you have used Claude Code, Codex or another assistant on this Mac on its own, Inferise Code looks for the plans it left behind and offers to bring them in. A banner at the top of the Plans pane says how many it found. Importing makes a copy; the originals are not changed. A plan made in a project that isn't open yet waits until you open that project.

Plans or the ToDo list?

Use a plan for work with several steps that depend on each other. Use the ToDo list for separate, small jobs you want to remember to ask for.

Something unclear or out of date? Tell us and we will fix it.